
I've recieved a Hybrid Fuelrail from a forum member parting out, all i can say is great quality and product. Furthermore i recieved an Aem FPR and an Aim Strada dash from England :up:

The Gearbox order has been made definate by determing the gear ratio's this is the graph:

As you can see the fallback in revs is minimal. That way the car will be mega responsive. When and if we are going to build the Engine in 2010 the revs will be even higher resulting in an even better graph.
The gearbox will be controlled by a pro shift paddle shift system which will arrive within 2 weeks. A preview picture:


The gearbox is due within 6 weeks, already looking forward to it. I also want to thank Randall for putting all the TLC in my car. The way he fabricates is for a lifetime and made with great care.
Thats all 4 now....